156 lines
5.5 KiB
Markdown
156 lines
5.5 KiB
Markdown
# Tuesday, February 18, 2026
|
|
|
|
## Morning
|
|
|
|
## Afternoon (~2:00 PM)
|
|
|
|
### Project Hub Tasks Created
|
|
User added 3 new tasks to track progress on OpenClaw infrastructure:
|
|
|
|
1. **Task #4**: Redesign Heartbeat Monitor to match UptimeRobot (Priority: High)
|
|
- Study https://uptimerobot.com design
|
|
- Match look, feel, style exactly
|
|
- Modern dashboard, status pages, uptime charts
|
|
|
|
2. **Task #5**: Fix Blog Backup links to be clickable (Priority: Medium)
|
|
- Currently links are text-only requiring copy-paste
|
|
- Different format for Telegram vs Blog
|
|
|
|
3. **Task #6**: Fix monitoring schedule - sites are down (Priority: Urgent)
|
|
- 2 of 3 websites down
|
|
- Cron job not auto-restarting properly
|
|
|
|
### Critical Incident: All 3 Sites Down (~2:13 PM)
|
|
- gantt-board (3000): DOWN
|
|
- blog-backup (3003): DOWN
|
|
- heartbeat-monitor (3005): DOWN
|
|
|
|
**Root Cause**: Cron job wasn't properly killing old processes before restart, causing EADDRINUSE errors.
|
|
|
|
**Resolution**:
|
|
- Manually restarted all 3 sites at 14:19
|
|
- Updated cron job with `pkill -f "port XXXX"` cleanup before restart
|
|
- Added 2-second delay after kill to ensure port release
|
|
- Created backup script: `monitor-restart.sh`
|
|
- Task #6 marked as DONE
|
|
|
|
### System Health (2:30 PM)
|
|
All 3 sites running stable after fix.
|
|
|
|
### New Task Created (2:32 PM)
|
|
**Task #7**: Investigate root cause - why are websites dying?
|
|
- Type: Research
|
|
- Priority: High
|
|
- Added to Project Hub Kanban board
|
|
- User wants to know what's actually killing the servers, not just restart them
|
|
- Suspects: memory leaks, file watchers, SSH timeout, power management, OOM killer
|
|
|
|
### New Task Created (2:35 PM)
|
|
**Task #8**: Fix Kanban board - dynamic sync without hard refresh
|
|
- Type: Task
|
|
- Priority: Medium
|
|
- Board uses localStorage which requires hard refresh to see updates
|
|
- Need server-side storage or sync mechanism for normal refresh updates
|
|
## [4:36 PM] Web App Health Check - All Healthy
|
|
|
|
- **Port 3000** (gantt-board): HTTP 200 (56ms) ✅
|
|
- **Port 3003** (blog-backup): HTTP 200 (12ms) ✅
|
|
- **Port 3005** (heartbeat-monitor): HTTP 200 (5ms) ✅
|
|
|
|
No restarts required.
|
|
|
|
## [6:02 PM] Cron Restarted All 3 Apps
|
|
|
|
All 3 web apps went down and the cron job manually restarted them:
|
|
- gantt-board (3000): Restarted and healthy
|
|
- blog-backup (3003): Restarted and healthy
|
|
- heartbeat-monitor (3005): Restarted and healthy
|
|
|
|
**Issue**: Auto-restart in cron environment has PATH/npm availability problems.
|
|
|
|
## [6:20 PM] Heartbeat Monitor Redesign Complete
|
|
|
|
Successfully rebuilt Heartbeat Monitor dashboard with:
|
|
- Fixed 280px glassmorphism sidebar
|
|
- Full-width max-w-7xl main content
|
|
- 4 KPI cards (grid-cols-2 md:grid-cols-4)
|
|
- 3-column service grid (grid-cols-1 md:grid-cols-2 lg:grid-cols-3)
|
|
- shadcn-style Card, Badge, Progress components
|
|
- Framer Motion animations
|
|
- Sparkline charts using recharts
|
|
|
|
**Tested and working** at http://localhost:3005
|
|
|
|
## [6:33 PM] Switched to Codex Branch
|
|
|
|
User wanted to show the codex branch design for comparison:
|
|
- Checked out `codex` branch from Gitea
|
|
- Different design approach - centered layout, single column
|
|
- Restarted server successfully
|
|
|
|
## [7:20 PM] Screenshot Capability Solved
|
|
|
|
**Problem**: User needed screenshots of local websites to share with friends (cannot access from outside home network).
|
|
|
|
**Investigation Results**:
|
|
- screencapture: Exists but requires interactive mode
|
|
- Playwright + Chrome: ✅ WORKS - successfully tested
|
|
- OpenClaw browser tool: Requires Chrome extension (not connected)
|
|
|
|
**Solution**: Installed Playwright globally (`npm install -g playwright`)
|
|
|
|
**Delivered**: 3 screenshots sent to Telegram:
|
|
1. Project Hub (gantt-board)
|
|
2. Blog Backup
|
|
3. Heartbeat Monitor (codex branch)
|
|
|
|
## [8:42 PM] All Sites Down - Manual Restart Required
|
|
|
|
All 3 web apps were down when monitor ran at 8:42 PM. Cron auto-restart failed due to PATH/npm environment issues. Manually restarted all services:
|
|
- gantt-board (3000): ✅ HTTP 200
|
|
- blog-backup (3003): ✅ HTTP 200
|
|
- heartbeat-monitor (3005): ✅ HTTP 200
|
|
|
|
**Action Items**:
|
|
- Fix cron auto-restart environment (PATH, npm availability)
|
|
- Consider using full paths in restart script
|
|
|
|
## [8:45 PM] Evening Status
|
|
|
|
All 3 web apps running stable after manual restart.
|
|
Playwright screenshot capability now permanently available.
|
|
User out for the evening - continuing work on open tasks.
|
|
|
|
## [8:45 PM - 9:05 PM] Worked on Open Tasks
|
|
|
|
### Task #5 COMPLETED: Fix Blog Backup Links
|
|
- Fixed parseDigest to extract URLs from markdown links `[Title](url)` in title lines
|
|
- Title is now the clickable link with external link icon on hover
|
|
- Better hover states - title turns blue, external link icon appears
|
|
- Committed and pushed to Gitea
|
|
|
|
### Task #8 COMPLETED: Fix Kanban Board Sync
|
|
- Added `/api/tasks` endpoint with file-based JSON storage
|
|
- Store now syncs from server on page load
|
|
- All changes auto-sync to server after every update
|
|
- Added loading indicator ("Syncing...") while fetching data
|
|
- Falls back to localStorage if server unavailable
|
|
- Committed and pushed to Gitea
|
|
- Marked Task #8 as done (was: backlog → now: done)
|
|
|
|
### Task #10 COMPLETED: Screenshot Research
|
|
- Playwright installed globally (`npm install -g playwright`)
|
|
- Can now take screenshots anytime without temporary installs
|
|
- Marked Task #10 as done (was: backlog → now: done)
|
|
|
|
## [9:05 PM] Summary of Evening Work
|
|
|
|
**3 Tasks Completed:**
|
|
1. ✅ Task #5 - Blog Backup links clickable
|
|
2. ✅ Task #8 - Kanban board server-side sync
|
|
3. ✅ Task #10 - Screenshot capability (Playwright)
|
|
|
|
**Remaining Open Tasks:**
|
|
- Task #1: Redesign Gantt Board (in-progress)
|
|
- Task #2: MoodWeave App Idea (backlog)
|